Sem Timeline

In December 2020, Águas da Condessa, a company of the Águas do Brasil Group, officially began operations in the municipality of Paraíba do Sul (RJ). With an investment of approximately R$85 million over the 35-year concession period—including R$24 million in the first five years—the company arrives in the city of 44,000 inhabitants prepared to improve water supply and the sewage collection and treatment system, contributing to the depollution of the Paraíba do Sul River basin.

In water supply, residents in the highest areas of the municipality constantly face water shortages. Águas da Condessa will provide full, high-quality supply with treated and monitored water, meeting World Health Organization standards.

Regarding the sewage collection and treatment system—which currently doesn’t exist—the concessionaire plans to reach 25% coverage of city properties in the first five years, improving quality of life and preserving the environment by preventing untreated sewage from being dumped into the Paraíba do Sul River basin, the region’s main water source.

Among other actions, improvements are planned in the first year to the main Water Treatment Plant, which has a capacity of 130 liters per second; adaptation of the meter park with 100% metering; construction of Operational Control Centers (CCOs) for monitoring water and sewage systems; plus a customer service store.

One of Águas da Condessa’s priorities will be combating water losses. Currently at around 47%, the company aims to reduce this to 25% through actions such as installing macro meters, network replacement, implementation of a new automation and control system, and quick leak repairs.

Concession Start: 12/26/2020
Municipality: Paraíba do Sul (RJ)
City Population: 44,467* inhabitants
Water Connections: 12,921
Water Accounts: 16,046
Water Treatment Plants: 1

*Population preview calculated based on the 2024 Demographic Census results from the Brazilian Institute of Geography and Statistics (IBGE).

2024

  • ETE Centro: First sewage treatment plant under construction (inauguration H1 2025), capacity 2.5M liters/day, 25% coverage for 10k residents

  • Water Network: 4km replacement in Queima Sangue (1.1k residents + factory benefited)

  • Community: Expanded Atendimento Itinerante program

2023

  • ETE Centro: Construction started (R$26M investment, 25% target by 2025)

  • New Facilities: Customer Service Store + CCO (24/7 real-time monitoring)

  • Programas: Trata Óleo launched (cooking oil collection)

  • 3-Year Totals: 9km network replacement, 10.3km new, 1.8k water connections, 11k meters replaced

2022

  • Network Expansion: 8.7km replaced + 10.3km new (incl. Barão de Angra)

  • Water Metrics: 1.5k new connections, 9.5k meters replaced, 360 standardized

  • ETA Upgrades: New treatment tech + revitalization completed

  • Sewage: 2.5km collector replacement (9 neighborhoods)

  • Production: +40% water output, losses 54% → 31.2%, 99.6% treated supply

  • Investments: R$15M spent, R$38M planned

2021

  • ETA Principal: Production 130l/s → 180l/s, fluoridation, new lab + automation

  • Neighborhoods: Reliable supply to 12k residents (9 bairros)

  • Network: 2.6km new, 1k connections, 4.4k meters replaced

  • Sewage: SES studies for 25% coverage target

  • Customer: Queue systems, digital channels, Atendimento Itinerante

  • Supply: 99% treated water coverage

2020

Concession Start: Dec 26, 2020

  • Investment: R$85M (35yrs), R$24M first 5yrs

  • Challenges: 47% water loss, 0% sewage, high areas without supply

  • Plans: ETA upgrade (130l/s), 100% metering, CCO, customer store, losses → 25%

Population: 44,467 | Water Connections: 12,921

Águas da Condessa WWTP System

Paraíba do Sul’s wastewater collection and treatment system now includes 1 WWTP, marking a historic milestone since Águas da Condessa began operations in December 2020.

Learn more about the unit:

Centro WWTP

  • Located in: Cerâmica neighborhood
  • Maximum Treatment Capacity: 2.5 million liters/day (Phase 1) → 5 million liters/day (expansion)
  • Suburbs served: Cerâmica D’Ângelo, Centro, Lava Pés, Palhas, Grama (10k residents)
  • Type of treatment: Secondary level, verticalized technology, 100% automated, 75% less land use

from the state of Rio de Janeiro.

At that time, 0% of the population had wastewater treated and there was no sewage collection system in the city.